Support My Blog

Showing posts with label Cashflow SAYURAN. Show all posts
Showing posts with label Cashflow SAYURAN. Show all posts

Thursday, October 28, 2010

KOS HALIA MUDA


Anggaran Kos Pengeluaran Halia Muda
(Sehektar/musim) Tahun 2010

Jarak Penanaman : 0.25 m x 0.5 m
Kepadatan : 60,000 pokok*
Jangkamasa penanaman : 5 - 6 bulan selepas menanam


A. Pendapatan Kasar 8,000 kg 2.7 /kg = RM 21,600.00

B Kos Pengeluaran Halia Muda

I Kos Berubah
Bahan-bahan Input
1 Benih 3000 rizom 2.5 / rizom = RM 7,500.00
2 Baja
a. Kapur 2.5 tan 280 /tan = RM 700.00
b. Baja organik 2.5 tan 440 / tan = RM 1,100.00
c. NPK 12:12:17:2 1 tan 2,440 /tan = RM 2,440.00
d. NPK 15:15:15 0.1 tan 2,400 /tan = RM 240.00
3 Racun kimia
a. Racun Rumpai (gramoxome) 6 liter 45 /liter = RM 270.00
b. Racun serangga 4 liter 90 /liter = RM 360.00
c. Racun kulat 4 liter 25 /liter = RM 100.00
4 Bahan lain
a. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kos bahan Input I = RM 12,710.00

II Kos Tenaga Kerja

1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Menanam 20 t.h. 30 /th = RM 600.00
3 Membaja dan mengapur 20 t.h. 30 /th = RM 600.00
4 Merumput dan menimbul tanah 20 t.h. 30 /th = RM 600.00
5 Mengawal musuh dan penyakit 15 t.h. 30 /th = RM 450.00
6 Memungut hasil 35 t.h. 30 /th = RM 1050.00
7 Memikul dan mengangkat (kontrak) 15 t.h. 30 /th = RM 450.00

Jumlah Kos Tenagakerja II = RM 4,750.00

III Kos Tetap

1 Sewa tanah 6 bulan 42 /ha/bln 2= RM 52.00
2 Alatan pengairan Semusim = RM 1,900.00
3 Bahan Api 250 liter 1.8 liter = RM 450.00

Jumlah Kos Tetap III = RM 2,602.00

Jumlah Kos Berubah ( I+II+III) = RM 20,062.00

C. Pendapatan
1 Pendapatan Kasar = RM 21,600.00
2 Jumlah kos (I+II+III) = RM 20,062.00
3 Kontigensi 5% = RM 1,003.10
4 Jumlah kos pengeluaran = RM 21,065.10
5 Pendapatan Bersih = RM 534.90
6 Harga Pulang Modal (Kos/kg) = RM 2.63
7 B/C Ratio = RM 1.03


Nota : * Berdasarkan 75% kawasan bertanam sehektar
By
M Anem
Penang

KOS PETOLA

Anggaran Kos Pengeluaran Petola/ha/musim Tahun 2010

Jarak Penanaman : 0.9 m x 0.9 m
Kepadatan : 9,200 pokok*
Jangkamasa penanaman : 4 bulan



A. Pendapatan Kasar 18,000 kg 1.2 /kg = RM 21,600.00

B Kos Pengeluaran Petola

I Kos Berubah
Bahan-bahan Input
1 Benih 5 kg 30 / kg = RM 150.00
2 Baja
a. Kapur 3 tan 280 /tan = RM 840.00
b. Baja organik 3 tan 440 / tan = RM 1,320.00
c. NPK 12:12:17:2 0.8 tan 2,440 /tan = RM 1,952.00
3 Racun kimia
a. Racun serangga 8 liter 90 /liter = RM 720.00
b. Racun kulat 8 liter 25 /liter = RM 200.00
e. Racun Rumpai 3 liter 45 /liter= RM 135.00
4 Bahan lain
a. Plastik Lutsinar 20 gulung 70 /gulung = RM 1,400.00
b. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kos Bahan Input (I) = RM 6,717.00

II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Membuat batas 25 t.h. 30 /th = RM 750.00
3 Membaja asas & kapur 12.5 t.h. 30 /th = RM 375.00
4 Menyulam dan menjarang 2 t.h. 30 /th = RM 60.00
5 Memasang sistem air & penyelenggaraan 4 t.h. 30 /th = RM 120.00
6 Menanam 6 t.h. 30 /th = RM 180.00
7 Menyembur serangga & kulat 9 t.h. 30 /th = RM 270.00
8 Merumput 10 t.h. 30 /th = RM 300.00
9 Membaja I,II,III dan IV 12 t.h. 30 /th = RM 360.00
10 Meracun rumpai 8 t.h. 30 /th = RM 240.00
11 Memungut hasil 60 t.h. 30 /th = RM 1,800.00

Jumlah Kos Tenagakerja (II) = RM 5,455.00

III Kos Tetap
1 Sewa tanah 3.5 bulan 42 /ha/bln = RM 147.00
2 Alatan pengairan = RM 1,187.50
3 Bahan Api
a. Diesel 300 liter 1.8 liter = RM 540.00

Jumlah Kos Tetap (III) = RM 1,874.50


Jumlah Kos Berubah ( I+II+III) = RM 14,046.50

C. Pendapatan
1 Pendapatan Kasar = RM 21,600.00
2 Jumlah kos (I+II+III) = RM 14,046.50
3 Kontigensi 5% = RM 702.33
4 Jumlah kos pengeluaran = RM 14,748.83
5 Pendapatan Bersih = RM 6,851.18
6 Harga Pulang Modal (Kos/kg) = RM 0.82
7 B/C Ratio = RM 1.46



Nota : * Berdasarkan 75% kawasan bertanam sehektar

BY
M ANEM
PENANG

KOS KAILAN


Anggaran Kos Pengeluaran Kailan/ha/musim Tahun 2010

Jarak Penanaman : 0.2 m x 0.15 m
Kepadatan : 210,000 pokok*
Jangkamasa penanaman : 4 minggu selepas menanam

A. Pendapatan Kasar 15,000 kg 2 /kg = RM 30,000.00


B Kos

I Kos Berubah
Bahan-bahan Input
1 Benih 1.5 kg 40 / kg = RM 60.00
2 Baja
a. Kapur 0.5 tan 280 / tan = RM 140.00
a. Baja organik 1 tan 440 / tan = RM 440.00
b. NPK 15:15:15 0.5 tan 2,400 / tan = RM 1,200.00
d. Baja foliar 15:15:6:4 9 liter 40 /liter = RM 360.00
3 Semaian
a. Media semaian@10 dulang
semaian/beg 100 beg 30 / beg = RM 3,000.00
b. Dulang semaian 2000 unit 3 / unit = RM 6,000.00
4 Racun kimia
a. Racun serangga 5 liter 90 /liter = RM 450.00
b. Racun kulat 3 liter 25 /liter = RM 75.00
c. Racun rumpai (Glufosinate-ammonium) 4 liter 45 liter = RM 180.00
5 Bahan lain
a. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kos Bahan Input (I) = RM 12,305.00


II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Semaian benih 5 t.h. 30 /th = RM 150.00
3 Menanam dan menyulam 18 t.h. 30 /th = RM 540.00
4 Menyiram 15 t.h. 30 /th = RM 450.00
5 Mengawal rumpai 20 t.h. 30 /th = RM 600.00
6 Kawalan penyakit dan perosak 15 t.h. 30 /th = RM 450.00
7 Membaja 8 t.h. 30 /th = RM 240.00
8 Memungut hasil 40 t.h. 30 /th = RM 1200.00

Jumlah Kos Tenagakerja (II) = RM 4,630.00


III Kos Tetap
1 Sewa tanah 1.5 bulan 42 /ha/bln = RM 63.00
2 Alatan pengairan Semusim = RM 950.00
3 Bahan Api 250 liter 1.80 liter = RM 450.00

Jumlah Kos Tetap (III) = RM 1,463.00


Jumlah Kos Berubah ( I+II+III) = RM 18,398.00


C. Pendapatan
1 Pendapatan Kasar = RM 30,000.00
2 Jumlah kos (I+II+III) = RM 18,398.00
3 Kontigensi 5% = RM 919.90
4 Jumlah kos pengeluaran = RM 19,317.90
5 Pendapatan Bersih = RM 10,682.10
6 Harga Pulang Modal (Kos/kg) = RM 1.29
7 B/C Ratio = RM 1.55



Nota : * Berdasarkan 64% kawasan bertanam sehektar
By,
M Anem
Penang

KOS KACANG BUNCIS


Anggaran Kos Pengeluaran Kacang Buncis

(Sehektar/musim) Tahun 2010

Jarak Penanaman : 0.6 m x 0.5 m
Kepadatan : 25,000 pokok*
Jangkamasa penanaman : 3 bulan

A. Pendapatan Kasar 12,000 kg 3.5 /kg = RM 42,000.00

B Kos

I Kos Berubah
Bahan-bahan Input
1 Benih 10 kg 30 / kg = RM 300.00
2 Baja
a. Kapur 2.5 tan 280 /tan = RM 700.00
b. Tahi ayam 5 tan 440 / tan= RM 2,200.00
c. NPK 12:12:17:2 0.7 tan 2,440 / tan = RM 1,708.00
3 Racun kimia
a. Racun serangga 10 liter 90 / liter = RM 900.00
b. Racun kulat 10 liter 25 / liter = RM 250.00
c. Racun rumpai 5 liter 45 / liter = RM 225.00
4 Bahan lain
a. Dawai No.10 3 gulung 43 /gulung = RM 129.00
b. Dawai No. 18 15 gulung 150 /batang = RM 2,250.00
c. Kayu penyokong 650 batang 2 /batang = RM 1,300.00
d. Plastik lutsinar 20 gulung 110 /gulung = RM 2,200.00
e. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kos Bahan Input (I) = RM 12,162.00


II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Penyediaan para dan dawai 7 t.h. 30 /th = RM 210.00
3 Menanam 9 t.h. 30 /th = RM 270.00
4 Menyiram 15 t.h. 30 /th = RM 450.00
5 Membaja 14 t.h. 30 /th = RM 420.00
6 Merumput 10 t.h. 30 /th = RM 300.00
7 Meracun serangga dan penyakit 21 t.h. 30 /th = RM 630.00
8 Mengikat tali rafia 33 t.h. 30 /th RM 990.00
9 Memungut hasil 120 t.h. 30 /th = RM 3,600.00

Jumlah Kos Tenagakerja (II) = RM 7,870.00

III Kos Tetap
1 Sewa tanah 2.5 bulan 42 /ha/bln = RM 105.00
2 Alatan pengairan = RM 1,187.50
3 Bahan api 62.5 liter 1.8 liter = RM112.50

Jumlah Kos Tetap (III) = RM 1,292.50


Jumlah Kos Berubah ( I+II+III) = RM 21,324.50

C. Pendapatan
1 Pendapatan Kasar = RM 42,000.00
2 Jumlah kos (I+II+III) = RM 21,324.50
3 Kontigensi 5% = RM 1,066.23
4 Jumlah kos pengeluaran = RM 22,390.73
5 Pendapatan Bersih = RM 19,609.28
6 Harga Pulang Modal (Kos/kg) = RM 1.87
7 B/C Ratio = RM 1.88



Nota : * Berdasarkan 75% kawasan bertanam sehektar


By
M Anem
Hotel Copthrone
Tanjung Bunga
Penang

KOS CILI


Anggaran Kos Pengeluaran Cili/ha/musim Tahun 2010

Jarak Penanaman : 0.9 m x 1.2 m
Kepadatan : 7,000 pokok*
Jangkamasa penanaman : 6 bulan



A. Pendapatan Kasar 14,000 kg 4 / kg = RM 56,000.00


B Kos
I Kos Berubah

i. Bahan-bahan Input
1 Benih 0.25 kg 1000 / kg = RM 250.00
2 Baja
a. Kapur 2.5 tan 280 / tan = RM 700.00
b. Baja organik 3 tan 440 / tan 1,= RM 320.00
c. Trisodium Phosphate (rawat benih) 0.03 kg 150 / Kg = RM 4.50
c. NPK 12:12:17:2 1.5 tan 2,440 / tan = RM 3,660.00
d. NPK 15:15:15 0.5 tan 2,400 / tan 1= RM ,200.00
e. MOP 0.5 tan 2,260 / tan = RM 1,130.00
f. Foliar 12 liter 30 / liter = RM 360.00
3 Semaian
a. Media semaian@10 dulang semaian/beg 7 beg 30 / beg = RM 210.00
b. Dulang semaian 70 unit 3 / unit = RM 210.00
4 Racun kimia
a. Racun serangga 32 liter 90 / liter = RM 2,880.00
b. Racun kulat 32 liter 25 / liter = RM 800.00
c. Racun rumpai(Glufosinate-ammonium) 20 liter 45 / liter = RM 900.00
5 Bahan lain
a. Tali rafia 10 gulung 7 / gulung = RM 70.00
b. Kayu penyokong 2,800 batang 2 / batang = RM 1,400.00
c. Silvershine 25 gulung 70 / gulung = RM 1,750.00
d. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kos Bahan Inputl (I) = RM 17,244.50

II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Semaian benih 2 t.h. 30 /th = RM 60.00
3 Memasang Silvershine Kontrak = RM 400.00
4 Menebuk lubang/Menanam/menyulam 12 t.h. 30 /th = RM 360.00
5 Menyiram 10 t.h. 30 /th = RM 300.00
6 Mengawal rumpai 12 t.h. 30 /th = RM 360.00
7 Mengawal serangga dan penyakit 30 t.h. 30 /th = RM 900.00
7 Membaja 30 t.h. 30 /th = RM 900.00
8 Memasang penyokong 10 t.h. 30 /th = RM 300.00
9 Memungut hasil 90 t.h. 30 /th = RM 2,700.00

Jumlah Kos Tenagakerja (II) = RM 7,280.00

III Kos Tetap
1 Sewa tanah 6 bulan 42 /ha/bln = RM 252.00
2 Alatan pengairan Semusim = RM 1,900.00
3 Bahan Api
a. Diesel 300 liter 1.8 / liter = RM 540.00

Jumlah Kos Tetap (III) = RM 2,692.00

Jumlah Kos Berubah ( I+II+III) = RM 27,216.50


C. Pendapatan
1 Pendapatan Kasar = RM 56,000.00
2 Jumlah kos (I+II+I RM II) = RM 27,216.50
3 Kontigensi 5% = RM 1,360.83
4 Jumlah kos pengeluaran = RM 28,577.33
5 Pendapatan Bersih = RM 27,422.68
6 Harga Pulang Modal (Kos/kg) = RM 2.04
7 B/C Ratio = RM 1.96



Nota : * Berdasarkan 75% kawasan bertanam sehektar
By,
M Anem
Hotel Copthrone
Tanjung Bunga
Pulau Pinang

Wednesday, October 27, 2010

KOS TIMUN

Anggaran Kos Pengeluaran Timun
(Sehektar /musim )Tahun 2010

Jarak Penanaman : 0.6 m x 0.6 m
Kepadatan : 20,000 pokok*
Jangkamasa penanaman : 3 bulan
Nama Bontanikal : Cucumis sativus


A. Pendapatan Kasar 35,000 kg 0.8 /kg 28,000.00

B Kos
I Kos Berubah

Kos Bahan-bahan Input
1 Benih 1.4 kg 150 / kg =RM 210.00
2 Baja
a. Kapur 2.5 tan 280 /tan = RM 280.00
b. Tahi ayam 5 tan 440 / tan = RM 2,200.00
c. NPK 15:15:15 0.2 tan 2,400 / tan = RM 480.00
d. NPK 12:12:17:2 0.5 tan 2,440 / tan = RM 1,220.00
e. Baja foliar 13:13:16 5 liter 30 / liter = RM 150.00
3 Racun kimia
a. Racun rumpai (Glufosinate-ammonium) 2 liter 45 / liter RM = 90.00
b. Racun serangga 10 liter 90 / liter = RM 900.00
c. Racun kulat 10 liter 25 / liter = RM 250.00
4 Bahan lain
a. Tali rafia 10 gulung 7 / gulung = RM 70.00
b. Dawai ( No.16 ) 24 gulung 280 / gulung = RM 840.00
c. Dawai ( No.10 ) 16 gulung 300 / gulung = RM 320.00
d. Tiang trellis 625 batang 8 / batang 330.00
e. Plastik Silvershine 20 gulung 70 / gulung = RM 1,400.00
f. Tray semaian 200 keping 3 / keping = RM 200.00
g. Peat moss 20 beg 30 / beg = RM 600.00
h. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kecil Bahan Input I = RM 9,940.00


II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Mengapur Kontrak = RM 200.00
3 Menanam 4 t.h. 30 /th = RM 120.00
4 Membuat junjung Kontrak = RM 100.00
5 Membaja Asas Kontrak = RM 200.00
6 Menyemai benih 2 t.h. 30 /th = RM 60.00
7 Memasang sistem pengairan 7 t.h. 30 /th = RM 210.00
8 Memasang plastik silvershine 5 t.h. 30 /th = RM 150.00
9 Mengikat tali pada struktur trellis 7 t.h. 30 /th = RM 210.00
10 Menyulam 1 t.h. 30 /th = RM 30.00
11 Menyiram 20 t.h. 30 /th = RM 600.00
12 Mengawal rumpai 2 t.h. 30 /th = RM 60.00
13 Mengawal serangga dan penyakit 6 t.h. 30 /th = RM 180.00
14 Membaja 6 t.h. 30 /th = RM 180.00
15 Menjalarkan pokok 2 t.h. 30 /th 60.00
16 Memungut hasil 50 t.h. 30 /th 1,500.00

Jumlah KOS TENAGAKERJA II = RM 4,860.00


III Kos Tetap
1 Sewa tanah 3.0 bulan 50 /ha/bln 150.00
2 Alatan pengairan Semusim 1,266.67
3 Bahan Api 250 liter 1.80 liter 450.00

Jumlah KOS tETAAP III = RM 1,866.67


Jumlah Kos Berubah ( I+II+III) = RM 16,666.67


C. Pendapatan
1 Pendapatan Kasar = RM 28,000.00
2 Jumlah kos (I+II+III) = RM 16,666.67
3 Kontigensi 5% = RM 833.33
4 Jumlah kos pengeluaran = RM 17,500.00
5 Pendapatan Bersih = RM 10,500.00
6 Harga Pulang Modal (Kos/kg) = RM 0.50
7 B/C Ratio = RM 1.60


Nota : * Berdasarkan 75% kawasan bertanam sehektar


by
M Anem
Tanjung Bunga
Penang

KOS BENDI


Anggaran Kos Pengeluaran Bendi
(Sehektar/musim) Tahun 2010


Jarak Penanaman : 0.9 m x 1.5 m
Kepadatan : 5,500 pokok
Jangkamasa penanaman : 4 bulan

Nama Bontanikal : Hibiscus esculenta


A. Pendapatan Kasar 15,000 kg 1.8 /kg = RM 27,000.00


B Kos

I Kos Berubah

Bahan-bahan Input
1 Benih 3 kg 150 / kg = RM 450.00
2 Baja
a. Kapur 2.5 tan 280 / tan = RM 700.00
b. Baja organik 2.5 tan 440 / tan = RM 1,100.00
c. NPK 12:12:17:2 1.2 tan 2,440 / tan = RM 2,928.00
d. MOP 0.16 tan 2,260 /tan = RM 361.60
4 Racun kimia
a. Racun serangga 10 liter 90 / liter = RM 900.00
b. Racun kulat 2 liter 25 / liter = RM 50.00
c. Racun rumpai 8 liter 45 / liter = RM 360.00
5 Bahan lain
a. Plastik lutsinar 20 gulung 110 /gulung = RM 2,200.00
b. Bakul plastik 10 unit 40 / unit = RM 400.00


Jumlah Kecil I = RM 9,049.60


II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Semaian benih 34 t.h. 30 /th = RM 1,020.00
3 Menanam/menyulam 14 t.h. 30 /th = RM 420.00
4 Menyiram 16 t.h. 30 /th 480.00
5 Mengawal rumapai 12 t.= RM h. 30 /th 360.00
6 Mengawal serangga dan penyakit 14 t.h. 30 /th = RM 420.00
7 Memungut hasil 90 t.h. 30 /th = RM 2,700.00

Jumlah Kecil II = RM 6,400.00



III Kos Tetap
1 Sewa tanah 4 bulan 42 /ha/bln = RM 168.00
2 Alatan pengairan Semusim = RM 1,187.50
3 Bahan Api 250 liter 1.80 liter = RM 450.00

Jumlah Kecil III = RM 1,805.50


Jumlah Kos Berubah ( I+II+III) = RM 17,255.10


C. Pendapatan
1 Pendapatan Kasar = RM 27,000.00

2 Jumlah kos (I+II+III) = RM 17,255.10
3 Kontigensi 5% = RM 862.76
4 Jumlah kos pengeluaran = RM 18,117.86
5 Pendapatan Bersih = RM 8,882.15
6 Harga Pulang Modal (Kos/kg) = RM 1.21
7 B/C Ratio = RM 1.49



Nota : * Berdasarkan 75% kawasan bertanam sehektar
By,
M Anem
Tanjung Bunga
Penang


KOS TERUNG


Anggaran Kos Pengeluaran Terung
(Sehektar musim Tahun 2010)

Jarak Penanaman : 0.9 m x 1.5 m
Kepadatan : 5,500 pokok*
Jangkamasa penanaman : 6 bulan

Nama Bontinikal : Solanum melongena



A. Pendapatan Kasar 16,500 kg 1.6 /kg = RM 26,400.00


B Kos


I Kos Berubah

Bahan-bahan Input
1 Benih 0.4 kg 300 / kg = RM 120.00
2 Baja
a. Kapur 2.5 tan 280 /tan = RM 700.00
b. Tahi ayam 5 tan 440 / tan = RM
2,200.00
c. NPK 15:15:15 0.5 tan 2,400 / tan = RM 1,200.00
d. NPK 12:12:17:2 1.2 tan 2,440 /tan = RM 2,928.00
3 Racun kimia
a. Racun rumpai 8 liter 45 /liter = RM 360.00
a. Racun serangga 10 liter 90 / liter = RM 900.00
b. Racun kulat 10 liter 25 / liter = RM 250.00
4 Bahan lain
a. Plastik lutsinar 25 gulung 70 /gulung = RM 1,750.00
b. Kayu penyokong 2,800 batang 1 /batang = RM 2,800.00
c. Tali rafia 10 gulung 7 /gulung = RM 70.00
d. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kos Bahan Input I = RM 13,278.00


II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Merata dan membaiki batas 12 t.h. 30 /th = RM 360.00
3 Menyemai 5 t.h. 30 /th = RM 150.00
4 Mengubah 12 t.h. 30 /th = RM 360.00
5 Penyelenggaraan sistem pengairan 10 t.h. 30 /th = RM 300.00
6 Membaja 12 t.h. 30 /th = RM 360.00
7 Meracun serangga/penyakit 25 t.h. 30 /th = RM 360.00
8 Mencantas dan sokongan 16 t.h. 30 /th = RM 750.00
9 Memasang penyokong 5 t.h. 30 /th = RM 480.00
10 Memungut hasil 120 t.h. 30 /th = RM150.00

Jumlah Kos Tenagakerja II = RM 4,270.00



III Kos Tetap
1 Sewa tanah 6.0 bulan 42 /ha/bln = RM 252.00
2 Alatan pengairan = RM 1,900.00
3 Bahan Api Diesel 300 liter 1.8 liter = RM 540.00

Jumlah Kecil III = RM 2,692.00



Jumlah Kos Berubah ( I+II+III) = RM 20,240.00


C. Pendapatan Terung:
1 Pendapatan Kasar = RM 26,400.00
2 Jumlah kos (I+II+III) = RM 20,240.00
3 Kontigensi 5% = RM 1,012.00
4 Jumlah kos pengeluaran = RM 21,252.00
5 Pendapatan Bersih = RM 5,148.00
6 Harga Pulang Modal (Kos/kg) = RM 1.29
7 B/C Ratio = RM 1.24



Nota : * Berdasarkan 75% kawasan bertanam sehektar

By,

M Anem

Copthorne Hotel. Penang

Kos Kacang Panjang


Anggaran Kos Pengeluaran Kacang Panjang

(Sehektar/musim Tahun 2010)

Jarak Penanaman : 0.6 m x 0.45 m
Kepadatan : 27,700 pokok*
Jangkamasa penanaman : 3 bulan



A. Pendapatan Kasar 16,000 kg 1.2 /kg = RM 19,200.00

B Kos Pengeluaraan Kacang Panjang


I Kos Berubah
Bahan-bahan Input
1 Benih 8 kg 60 / kg = RM 480.00
2 Baja
a. Kapur 2.5 tan 280 /tan = RM 700.00
b. Baja organik 2.5 tan 440 / tan = RM 1,100.00
c. NPK 12:12:17:2 0.8 tan 2,440 / tan = RM 1,952.00
3 Racun kimia

a. Racun rumpai (Glufosinate-amonium) 5 liter 45 / liter = RM 225.00
a. Racun serangga 10 liter 90 / liter = RM 900.00
b. Racun kulat 10 liter 25 / liter = RM 250.00
4 Bahan lain
a. Tali rafia 10 gulung 7 /gulung = RM 70.00
b. kayu penyokong 2000 batang 1 /batang = RM 2,000.00
c. Plastik Lutsinar 20 gulung 70 /gulung = RM ,400.00
d. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kecil I = RM 7,677.00



II Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Membuat batas 25 t.h. 30 /th = RM 750.00
3 Menanam 8 t.h. 30 /th = RM 240.00
4 Menyiram 20 t.h. 30 /th = RM 600.00
5 Mengawal rumpai 8 t.h. 30 /th = RM 240.00
6 Mengawal serangga dan penyakit 16 t.h. 30 /th = RM 480.00
7 Membaja 8 t.h. 30 /th = RM 240.00
8 Memasang pancang dan mengikat sulur 8 t.h. 30 /th = RM 240.00
9 Memungut hasil 70 t.h. 30 /th = RM 2,100.00

Jumlah Kecil Kos Tenagakerja II = RM 5,890.00


III Kos Tetap
1 Sewa tanah 3 bulan 42 /ha/bln =RM 126.00
2 Alatan pengairan = RM 1,187.50
3 Bahan api 105 liter 1.8 /liter = RM 189.00

Jumlah Kecil III = RM 1,313.50

Jumlah Kos Berubah ( I+II+III) 14,880.50

C. Pendapatan
1 Pendapatan Kasar = RM 19,200.00
2 Jumlah kos (I+II+III) = RM 14,880.50
3 Kontigensi 5% = RM 744.03
4 Jumlah kos pengeluaran = RM 15,624.53
5 Pendapatan Bersih = RM 3,575.48
6 Harga Pulang Modal (Kos/kg) = RM 0.98
7 B/C Ratio = RM 1.23



Nota : * Berdasarkan 75% kawasan bertanam sehektar


By,

M Anem, Batu Feringgi

Penang

KOS TOMATO



KOS PENGELUARAN TOMATO SEHEKTAR PADA TAHUN 2010

Jarak tanaman : 0.6 m x 0.6 m
Bilangan Pokok : 20,800 pokok*
Jangkamasa penanaman : 6 bulan



A. Pendapatan Kasar Tomato = 18,000 kg 1.6 /kg = RM 28,800.00


B. Kos

I. Kos Bahan Input
1 Benih 0.3 kg 300 /kg = RM 90.00
2 Kos 3 jenis baja Baja:
a. Kapur 2.5 tan 280 / tan = RM 700.00
b. Tahi ayam 3 tan 440 / tan = RM 1,320.00
c. NPK 12:12:17:2 1.6 tan 2,440 / tan = RM 3,904.00
3 Semaian
a Media semaian @ 80liter/bag 15 beg 28 /beg = RM 420.00
b.Tray semaian * 210 unit 3 /unit = RM 630.00
4 Racun kimia

a. Racun serangga 6 liter 90 /liter = RM 540.00
b.Racun kulat
i. Benomyl 0.5 kg 35 /kg 17.50
ii. Carbandazim 0.5 kg 24 /kg= RM12.00
c. Racun rumput 16 liter 45 / liter = RM 720.00
5 Bahan lain

a. Tali rafia 6 gulung 7 /gulung = RM 42.00
b. Dawai @tempoh 2 tahun 15 gulung 50 /gulung = RM 375.00
c. Kayu penyokong 8,000 batang 1 /batang = RM 4,000.00
d. Plastik Silvershine 22 gulung 70 / gulung = RM 1,540.00
e. Bakul plastik 10 unit 40 / unit = RM 400.00

Jumlah Kecil Kos Bahan Input (I) = RM 14,710.50

II. Kos Tenaga Kerja
1 Penyediaan tanah dan batas Kontrak = RM 1,000.00
2 Semaian benih 1 t.h. 30 /th = RM 30.00
3 Menutup batas silvershine 14 t.h. 30 /th = RM 420.00
4 Menanam 8 t.h. 30 /th = RM 240.00
5 Memasang penyokong dan dawai 20 t.h. 30 /th = RM 600.00
6 Menyiram 16 t.h. 30 /th = RM 480.00
7 Membaja 8 t.h. 30 /th = RM 240.00
8 Mengawal rumpai 8 t.h. 30 /th = RM 240.00
9 Mengawal serangga ,penyakit 16 t.h. 30 /th = RM 480.00
10 Mengikat pokok pada trelis 6 t.h. 30 /th = RM 180.00
11 Memungut hasil 30 t.h. 30 /th = RM 900.00

Jumlah Kecil Kos Tenagakerja (II) = RM 4,810.00

III. Kos Tetap
1 Sewa tanah 6.0 bulan 42 /ha/bln = RM 252.00
2 Alat pengairan renjis* = RM 1,900.00
3 Pemasangan drip tape 20 /gulung
4 Bahan Api 250 liter 1.80 liter = RM 450.00

Jumlah Kecil Kos Tetap (III) =
RM 2,602.00

Jum. Kos Pengeluaran I+II+III= RM 22,122.50
C. Pendapatan
1 Pendapatan Kasar =
RM 28,800.00
2 Jumlah kos (I+II+III) = RM 22,122.50
3 Kontigensi 5% = RM 1,106.13
4 Jumlah kos pengeluaran = RM 23,228.63
5 Pendapatan Bersih = RM 5,571.38
6 Harga Pulang Modal (Kos/kg) = RM 1.29
7 B/C Ratio = RM 1.24


Nota : * Berdasarkan 75% kawasan bertanam sehektar
Musim penanaman 2 kali setahun

Oleh:

M Anem
Batu Feringi
Penang
Oct 2010


THANK YOU

LinkWithin

Related Posts Plugin for WordPress, Blogger...